Rigging the levelwind for extraction from the winch pit. Each piece of gear was meticulously secured to be moved carefully.
DSCN0367-P15 C19-Donenfeld-1920-WM
Written by
in
Written by
in
Rigging the levelwind for extraction from the winch pit. Each piece of gear was meticulously secured to be moved carefully.
Leave a Reply
You must be logged in to post a comment.