Moving large blocks of ice out of the way, in order to extract the heavy tower base feet, which were embedded in the ice under the floor.
DSCN0475-Arch-Donenfeld-1920-WM
Written by
in
Written by
in
Moving large blocks of ice out of the way, in order to extract the heavy tower base feet, which were embedded in the ice under the floor.
Leave a Reply
You must be logged in to post a comment.