DSCN0582-Arch-Donenfeld-1920-WM

Filling in the winch pit. Blocks cut to extract the tower base feet are re-used to construct a protective wall around the borehole slot, so snow only fills the winch pit, and leaves the slot clear.


Comments

Leave a Reply